2023
Semiconductor Facility, Kulim Hi-Tech Park
320 workstations · 40 private offices · 6 meeting suites
Full office fit-out delivered in three phases around a live production schedule, with installation run on night shifts so no line time was lost.
A selection of office fit-out and furniture contracts, from single executive floors to multi-site rollout programmes.
2023
320 workstations · 40 private offices · 6 meeting suites
Full office fit-out delivered in three phases around a live production schedule, with installation run on night shifts so no line time was lost.
2022
14 branches · rolled out over 11 months
A single specification applied across every branch so replacement parts and finishes stay common, with each site surveyed and installed over a weekend.
2023
180 workstations · executive floor · canteen
Open-plan engineering floors with acoustic screening, an executive level in veneer, and a 200-seat canteen finished for wash-down cleaning.
2021
Library · 90 faculty offices · 4 lecture rooms
Library shelving and study carrels, faculty offices on a repeating module, and fold-and-nest tables so lecture rooms convert to examination layout.
2024
Executive floor · boardroom · reception
A veneer boardroom table built to the room with integrated AV, matching credenzas, and reception seating specified with the interior designer.
2022
120 workstations · records room · waiting areas
Administration floors plus a high-density mobile compactor records room, with waiting-area seating in wipe-clean vinyl to infection-control requirements.
Send the floor plan and headcount and we will come back with a layout and a budget.